![]() Hall is committed to supporting mining companies and government agencies in adhering to these industry-best practices to decrease risk and prevent tailings storage facility failures. The document establishes clear expectations around tailings facility planning, design, construction, operation, maintenance, monitoring, closure and post closure activities. The Global Industry Standard on Tailings Management (GITSM) sets a global benchmark for the safe management of tailings facilities, with the goal of zero harm. ![]() Global Industry Standard on Tailings Management (GISTM) Our diverse fleet of cutter suction, amphibious and backhoe dredges is unrivalled in Australia and is backed up with a vast array of high-pressure water jets, slurry pumps and evaporation units, enabling us to select the right equipment for each project and maximise efficiency. With the capabilities to handle coal and uranium tailings and everything in between, our team members are competent working in highly acidic and highly regulated environments. capture valuable commodities leftover in waste products.manage the capacity of tailings storage facilities and. ![]() Some of the projects we have undertaken include a six-year contract to remove 26.8 million tonnes of tailings from a tailings storage facility (TSF) using two dredges operating 24/7, 365 days a year, as well as smaller projects involving our unique amphibious dredges removing fine coal tailings from a mine process water dam. In addition to our extensive experience in ports and harbour dredging, we have a strong track record and proven expertise in mine tailings dam dredging and remediation. ![]() As Australia’s largest dredging contractor, Hall boasts a solid track record in dredging projects and has developed a reputation as the go-to dredging contractor in the Asia-Pacific region. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |